top of page
tekton-SVpCSOCcCwA-unsplash.jpg

Shear Wall Vertical Connection System

Product Overview

Mount the connection rings (boxes) on the formwork before casting the precast walls, spacing them according to the required shear‑load capacity. After demoulding, remove the anti‑fouling tape and open the steel‑wire‑rope loops with a hammer or crowbar. Position, brace, pour, and install the wall panels in accordance with the floor plan. Insert a vertical reinforcing bar between the joint collars of both walls, keeping the wire‑rope loops horizontal. Finally, erect the formwork, pour concrete into the joint, and wait for final set.

Standard steel‑wire‑rope loop lengths of 60 mm, 80 mm, 100 mm, 120 mm, and 140 mm suit joints in precast concrete wall panels 80 mm – 140 mm thick.

Features

Easy installation: Individual boxes are fixed directly to the formwork.
 

Patented design: The flexible wire loop remains open automatically.
 

Simple anchoring: The tail inserts easily into the reinforcement cage.
 

Secure seating: Edge steps lock the box into the concrete.
 

Tri‑axial resistance: Performance is calculated in accordance with EN 1992‑1‑1.

Product Information

图片1(14).png

Product Brochure

Product Connection Method

图片1(15).png
图片1(21).png

Introduction to Connectivity

Standard nodes

Corner nodes

T-part node

Video Explanation

Product Usage Video

Calculation Software

Product Installation Video

Relevant Standards

More Related Products

双皮墙片_edited_edited.png

Sandwich insulation laminated shear wall

image.png

HMSPC-A sandwich wall panel limit tie piece

19346d839fb24d3fb2a13c45055ee3d.png

HMSPC-T Thick Insulation Sandwich Wall Panel Clip-on Support Tie Piece

WHY CHOOSE HAZ BA

We specialize in designing and manufacturing high‑performance fixing systems and structural components, delivering design‑led solutions tailored to diverse façade typologies. Committed to exceptional customer support, we provide comprehensive technical assistance at every project stage. Our innovative design and production methods yield practical, cost‑effective answers to façade challenges. We rigorously adhere to established standards and uphold the highest production quality. With an outstanding track record, we collaborate with clients as a trusted solution provider for demanding projects.

背景图片1

Email 

Call

+86 156 1180 0048

Location

CABR 19th Floor, Building C, East Third Ring North Road No.30, Chaoyang District, Beijing, China.

Follow

  • LinkedIn
  • Youtube

© 2016 - 2025 by HAZ BA, all right reserved.

bottom of page